A BESS auxiliary transformer steps the 600 V or 690 V inverter bus down to 400/230 V and creates the neutral that every low-voltage load on site depends on: HVAC, fire systems, controls, lighting and comms. It is small next to the main power transformer, it is easy to overlook, and it is often the last item on the electrical schedule to get a part number against it.

Batteries now make up more than half of the National Electricity Market’s connection pipeline, with more than 40 GW of battery projects working through it. Every one of those sites needs a reliable 400/230 V supply. None of it runs at 690 volts.

bess auxiliary transformer site montage. Shows IP65 external transformer, as well as an integrated IP00 transformer sitting within the BESS unit.
Typical BESS auxiliary transformer arrangements (IP65 external connection / integrated IP00 solution)

Why a battery site needs a BESS auxiliary transformer

A typical utility-scale battery or solar block connects to the network at 22 kV or 33 kV through a ring main unit, then steps down through a main power transformer to the inverter bus. That bus is not 400 volts. It is usually 600 V or 690 V, because running the inverter at a higher voltage cuts the current for a given power, and with it the copper, busbar and switchgear.

Two arrangements we see regularly:

22 kV / 0.6 kV main transformer, 2,500 kVA, feeding a central inverter
33 kV / 0.69 kV main transformer, 4,500 kVA, feeding an inverter and battery strings
Both leave the same gap: there is no 400/230 V supply anywhere on site, and no neutral.

The BESS auxiliary transformer fills it by doing two jobs at once:

Steps down from the 600 V or 690 V inverter bus to 400/230 V
Derives the neutral. A delta–star (Dyn11) winding creates a star point that becomes the neutral and earth reference for the whole LV installation
Without it you cannot run a single 230 V load or establish an MEN earthing arrangement for the LV system. It is not an optional extra. It is the only source of usable low voltage on the site.

3ph 150kVA isolation transformer encased IP23
3ph 150kVA isolation transformer encased IP23

What it feeds, and how to size it

The auxiliary board on a battery site typically carries:

  • HVAC and thermal management. By far the largest load, and the one that sets the rating. Lithium cells have a narrow temperature window, so cooling runs continuously
  • Fire detection and suppression
  • Battery management and control systems
  • UPS for controls, protection and comms
  • Lighting, internal and flood
  • Security, CCTV and access control
  • Fibre and communications
  • Maintenance outlets

On the two arrangements above, both auxiliary transformers were rated 150 kVA: about 6% of the 2,500 kVA block and about 3% of the 4,500 kVA block. As a rule of thumb, auxiliary load lands between 1% and 5% of plant rating, with HVAC and climate deciding where in that range.

Worth settling early: does the auxiliary supply need to stay live when the battery is offline or islanded? If so, the design needs a separate network-derived supply or enough UPS capacity to carry critical loads, and that changes the switching arrangement well upstream of the transformer.

fan-cooled transformer inside bess skid. 3ph isolation transformer
Typical BESS auxiliary transformer integrated into BESS system

Dry-type or oil, next to a lithium battery

BESS Auxiliary transformers on these sites are often specified as oil-filled, largely out of habit from distribution practice. On a battery site it deserves a second look.

A BESS already carries a significant fire load and a fire strategy built around it. An oil-filled transformer inside or beside the same enclosure adds a second, separate fire load, and brings bunding and oil containment with it.

A dry-type transformer removes the oil entirely: no containment, no bunding, no oil sampling regime, and no liquid fire load beside the cells. For an auxiliary unit in the 100–250 kVA range, the cost difference is small against the civil and compliance work that oil containment pulls in behind it.

It is not automatically the right answer for every site, but on a lithium installation it should be an explicit decision rather than a carry-over from the last project.

3ph 75kVA isolation transformer Primary terminals with off-load taps and isolated electrostatic screen terminal.
3ph 75kVA isolation transformer Primary terminals with off-load taps and isolated electrostatic screen terminal.

Cooling and fit: making it suit the skid

The usual objection to dry-type is size. On a battery skid, space and ventilation are tight, and every dimension is fought over. That is a design problem, not a reason to default to oil, and there are several ways to solve it:

  • Air natural (AN). The standard and simplest arrangement: no moving parts, nothing to maintain. Best where there is room for the frame size and a clear airflow path.
  • Forced-air fan cooling (AF). Fans moving air through the windings let a physically smaller transformer carry the same load. Where the skid or container already has managed airflow, this can bring both the footprint and the price down noticeably.
  • Open-type, chassis-mounted. Supplied without its own enclosure, to sit inside the skid’s existing cooled and protected compartment. No duplicated enclosure, smallest possible footprint.
  • Enclosed to suit the location. Ventilated IP23 for sheltered installations, or sealed IP65 for exposed outdoor positions, with plinths, side wiring chambers and cable entry arranged to suit the installation.
  • Temperature monitoring. Winding temperature sensors led out to the site controller, so fan control and alarms tie into the battery management and SCADA systems.
  • Design margin for the real environment. Ambient temperature, solar gain on an enclosure and corrosion category all feed into the thermal design. A transformer rated at 40°C ambient in a Melbourne workshop behaves differently in full sun in central Queensland, and the design should reflect where it is going.

Because every unit is designed to order, the cooling method, frame and enclosure are chosen around the installation and its space limits, rather than the installation being adjusted to suit a catalogue item.

Two other things that catch people out

Harmonics. The auxiliary transformer is fed from the inverter bus, not the network, so it sees switching harmonics continuously. A K-rated design handles the extra eddy-current heating without running hot. K4 is standard on our units for exactly this reason. A general-purpose transformer fed from an inverter will run hotter than its nameplate suggests.

Energising from an inverter. Every transformer draws a short burst of magnetising current when it is switched on. A stiff network supply absorbs it easily. An inverter usually limits its output current instead, so a transformer energised from the inverter bus may be slow to come up or may trip the source. If the auxiliary transformer will be energised from the inverter rather than the grid, say so in the specification so the design and the protection settings can account for it.

The specification, in eight lines

Settle these when the single line diagram is first drawn and the rest follows:

  1. Primary voltage (the inverter bus: typically 600 V or 690 V)
  2. Secondary voltage: 400/230 V
  3. Vector group: Dyn11
  4. kVA, from the auxiliary load schedule
  5. K-rating: K4 for inverter-fed supplies
  6. Cooling: air natural or fan-assisted
  7. Enclosure: open-type, IP23 or IP65
  8. Site ambient and installation constraints (space, airflow, cable entry, energisation source)

Why it gets left to last

The main power transformer is a long-lead item and gets ordered early because everyone knows it will take months. The auxiliary transformer is small, comparatively cheap, and easy to assume someone else has covered.

Then the LV schedule is drawn, someone asks where the 230 V comes from, and a 150 kVA unit with a 690 V primary is suddenly on the critical path: a non-standard voltage that most suppliers do not hold in stock and importers cannot turn around quickly.

Southern Transformers: built for this

Southern Transformers has designed and built dry-type transformers in Dandenong South, Victoria, since 1977. Auxiliary transformers for battery and solar sites sit squarely in what we do: three-phase, delta–star, K4-rated, built to the voltage, cooling and enclosure the site actually needs.

  • Designed and built in Australia to AS/NZS 60076 and AS/NZS 61558
  • Every unit routine-tested in our own facility, with test reports and a certificate of compliance
  • 5-year warranty as standard, on a 25+ year design life
  • Guaranteed lead time. We agree the schedule up front, and if we miss it, you get credits back
  • Custom to the installation: cooling, frame size, enclosure and terminations to suit the skid, not the catalogue

Send us the single line diagram and the auxiliary load schedule. We will come back with a recommended rating, cooling arrangement, dimensions and lead time.

Southern Transformers | Southern Electronic Services Pty Ltd 8 Superior Drive, Dandenong South VIC 3175 | 03 9706 4202 | sales@southerntransformers.com.au

Frequently asked questions

What does a BESS auxiliary transformer do in a grid-level battery system?
It steps the inverter bus voltage (typically 600 V or 690 V) down to 400/230 V and derives a neutral, supplying the site’s HVAC, fire systems, battery management, UPS, lighting, security and communications.

What size BESS auxiliary transformer does a battery storage site need?
It depends on the auxiliary load schedule, mostly HVAC. As a rule of thumb, auxiliary load is 1% to 5% of plant rating; 150 kVA is common on 2.5 MVA to 4.5 MVA blocks.

Should a BESS auxiliary transformer be dry-type or oil-filled?
Dry-type removes the oil fire load, bunding and containment from a site that already carries a significant fire risk. It is worth considering on any lithium battery installation.

What vector group is used for a 690 V to 400 V BESS auxiliary transformer?
Dyn11 is typical. The delta primary suits the three-wire inverter bus, and the star secondary provides the neutral and earth reference for the LV system.

Can a dry-type BESS auxiliary transformer fit on a compact BESS skid?
Usually, yes. Fan cooling, open-type construction for mounting inside an existing compartment, and a frame designed around the available space all reduce the footprint compared with a standard naturally cooled unit.


, , , ,